About MARS

Shanghai Mars Electric Power Equipment Co., Ltd.

A Chinese manufacturer of power transmission and distribution equipment, headquartered in Pudong New Area, Shanghai — designing, building, testing and servicing a complete power chain from 5 kVA distribution transformers to 10 MWh energy storage containers.

Transformer coil on a winding machine in the factory

Company

Shanghai Mars Electric Power Equipment Co., Ltd. (MARS) designs, manufactures, tests and services a complete power chain — oil-immersed and cast-resin dry-type transformers, power transformers, pad-mounted and pole-mounted transformers, compact and box-type substations, medium- and low-voltage switchgear and ring main units, and lithium-iron-phosphate energy storage systems, from outdoor cabinets to megawatt-scale liquid-cooled containers.

Our range covers 5 kVA to 31,500 kVA at 3 kV to 35 kV, with power-class units up to 110 kV, and energy storage from 40 kWh cabinets to 10 MWh containerised systems. Every unit is built to IEC 60076 and IEC 62271, with ANSI/IEEE, GB and GOST-compliant designs available for projects in North America, Europe, the Middle East, Africa, Southeast Asia and the CIS.

Because we engineer and build in-house, almost everything is customisable: capacity, voltage ratio, vector group, winding material, insulation class, enclosure protection and cooling. Tell us the grid and the site, and we will build the equipment to match.

MARS exhibition stand with the company wordmark and the tagline Global Power, Trusted MARS
25,000 m²Manufacturing base in Shanghai
200+Staff, including 30+ design and test engineers
40+Countries served
9Product lines, 137 standard configurations
Since 2016Manufacturing transformers and switchgear

Factory

MARS equipment is built in our own workshops, not sourced and re-badged. Our 25,000 m² Shanghai manufacturing base runs as four connected production lines under one roof: transformer winding and assembly, switchgear and cabinet fabrication, compact substation and container integration, and energy storage assembly — each served by overhead travelling cranes and finished on a single, continuously routed assembly floor.

Production begins at the winding shop, where oxygen-free copper conductor is drawn from stock reels and wound on CNC-controlled winding machines for both foil and wire coils. Cast-resin coils are vacuum-cast and cured in-house; oil-immersed cores are stacked, clamped, vapour-phase dried and tanked; tanks and cabinet enclosures are cut, punched, folded and powder-coated on our own sheet-metal line. Switchgear and low-voltage panels are assembled and wired at dedicated stations, then bench-tested cabinet by cabinet before the busbar and secondary wiring are signed off.

Rows of open switchgear cabinets in the MARS assembly hall with an engineer checking wiring
Rows of open switchgear cabinets in the MARS assembly hall
Wide view of the MARS transformer assembly line with overhead cranes and finished units
Wide view of the MARS transformer assembly line
One-point perspective down the main MARS production hall with a conveyor line and workers
One-point perspective down the main MARS production hall
Oil-immersed transformer tanks and corrugated panels on the MARS fabrication floor
Oil-immersed transformer tanks and corrugated panels on the MARS fabrication floor
Cast-resin transformer coils curing after vacuum casting in the MARS winding shop
Cast-resin transformer coils curing after vacuum casting in the MARS winding shop
CNC copper winding machine and reels of oxygen-free copper conductor in the MARS winding shop
CNC copper winding machine and reels of oxygen-free copper conductor in the MARS winding s

Testing and quality

Every unit passes routine testing before it leaves — winding resistance, turns ratio, insulation resistance, no-load and load loss, applied and induced voltage withstand, partial discharge — and temperature-rise and dielectric type tests on request. Energy storage systems add cell-grading, BMS communication, insulation, liquid-cooling leak and full charge/discharge verification.

Finished equipment is shrink-wrapped, palletised or cased in fumigation-free wooden crates and shipped worldwide, with documentation packs, type-test reports and factory acceptance tests (FAT) arranged on request — customer and third-party witness testing welcome. Read our FAT checklist for what a full acceptance programme covers.

Routine and optional tests
TestApplies toWhen
Winding resistance, ratio & vector groupAll transformersRoutine, every unit
No-load & load loss, impedanceAll transformersRoutine, every unit
Applied & induced voltage withstandAll transformersRoutine, every unit
Partial dischargeDry-type and ≥ 10 kV oil-immersedRoutine / on request
Temperature rise, lightning impulseTransformersType test, on request
Dielectric, mechanical operation, IPSwitchgear & substationsRoutine, every panel
Cell grading, BMS, insulation, leak, charge/dischargeEnergy storageRoutine, every system

Certifications

A certified management system and product approvals for four regulatory regions.

ISO 9001:2015 quality management system certificate issued to Shanghai Mars Electric Power Equipment by NOA
ISO 9001:2015 Quality ManagementNOA (CNAS / IAF)Valid 12 May 2024 – 11 May 2027
ISO 14001:2015 environmental management system certificate issued to MARS by NOA
ISO 14001:2015 Environmental ManagementNOA (CNAS / IAF)Valid 28 May 2024 – 27 May 2027
ISO 45001:2018 occupational health and safety certificate issued to MARS by NOA
ISO 45001:2018 Occupational Health & SafetyNOA (CNAS / IAF)Valid 3 Apr 2025 – 2 Apr 2028
CE type approval certificate from ECM for MARS power transformers 5 kVA to 31,500 kVA
CE Type Approval — ECM (EN IEC 61558-1)ECM (Italy)Valid 20 Sep 2024 – 19 Sep 2029
UDEM technical inspection attestation of conformity to EN 62271-1 and EN 60076-1 for MARS transformers and switchgear
UDEM Technical Inspection AttestationUDEM (Türkiye)Valid 26 Apr 2024 – 25 Apr 2029
Eurasian Economic Union EAC declaration of conformity for MARS transformers
EAEU EAC Declaration of ConformityEAEU / TESTPROMValid 16 Apr 2024 – 15 Apr 2029
Certificates held by MARS
CertificateStandard / scopeBodyValidity
Quality Management SystemISO 9001:2015 / GB/T 19001-2016NOA (CNAS / IAF)12 May 2024 – 11 May 2027
Environmental Management SystemISO 14001:2015 / GB/T 24001-2016NOA (CNAS / IAF)28 May 2024 – 27 May 2027
Occupational Health & SafetyISO 45001:2018 / GB/T 45001-2020NOA (CNAS / IAF)3 Apr 2025 – 2 Apr 2028
CE — Type ApprovedEN IEC 61558-1:2019, LVD 2014/35/EU; power transformers 5 kVA–31,500 kVA, 3–35 kVECM (Italy)20 Sep 2024 – 19 Sep 2029
Technical Inspection AttestationEN/IEC 62271-1, EN/IEC 60076-1; oil-immersed, dry-type, compact substation, HV & LV switchgearUDEM (Türkiye)26 Apr 2024 – 25 Apr 2029
EAEU Declaration of ConformityTR CU 004/2011 (LVD), TR CU 020/2011 (EMC); GOST IEC 60076-1/-11EAEU / TESTPROM16 Apr 2024 – 15 Apr 2029

Certified models include S9/S11/S18/S20/S22, S11-M, S13-M, SH15-M, SCB10-14/18, SCBH15-19, D11, DH15, ZGS, YB, KYN28/KYN28A, HXGN12, SF6, GGD, GCS, GCK and MNS.

Exhibitions

Meet the MARS team at power and renewable-energy trade fairs — or arrange a factory visit in Shanghai.

MARS exhibition stand with the company wordmark and the tagline Global Power, Trusted MARS
MARS exhibition stand
Visitors discussing transformer specifications with MARS engineers at a power industry trade fair
Visitors discussing transformer specifications
MARS booth displaying a cast-resin dry-type transformer and switchgear panel at an exhibition
MARS booth displaying a cast-resin dry-type transformer and switchgear panel at an exhibit
MARS sales team greeting international buyers at an electrical equipment exhibition
MARS sales team greeting international buyers at an electrical equipment exhibition
Crowded MARS exhibition booth with product displays and signage
Crowded MARS exhibition booth
MARS engineers presenting energy storage cabinets to visitors at a renewable-energy exhibition
MARS engineers presenting energy storage cabinets to visitors at a renewable-energy exhibi

How we work with you

  1. 1

    Enquiry

    Send the rating, voltage ratio, frequency, standard, quantity and destination — or a single-line diagram. Use the quote list to send several items at once.

  2. 2

    Technical proposal

    Within one working day an engineer confirms the configuration, flags anything that needs a decision (vector group, impedance, IP class, cooling) and prices it.

  3. 3

    Drawing approval

    Outline drawings, nameplate data and test plan are issued for approval before production starts.

  4. 4

    Production and testing

    Typical lead time is 25–45 days for distribution transformers and switchgear. Routine tests on every unit; FAT witnessed by you or a third party if required.

  5. 5

    Packing and shipping

    Fumigation-free crates, oil-filled or dry shipment as specified, impact recorders on request. EXW, FOB, CIF or DAP with full document packs.

  6. 6

    Installation support

    Installation guidance, commissioning checklists and remote support; on-site commissioning by arrangement.

Frequently asked questions about MARS

Where is MARS located?

Our head office is in Room 1001, Jin Gang Building, No. 55 Aona Road, Pudong New Area, Shanghai, China, with the manufacturing base in the Shanghai area. Both are about one hour from Pudong International Airport.

Is MARS a manufacturer or a trading company?

A manufacturer. Winding, resin casting, core assembly, tank fabrication, painting, switchgear assembly and testing are done in our own 25,000 m² plant under an ISO 9001 system audited by NOA, ECM and UDEM.

Which markets do you export to?

Customers in more than 40 countries across the Middle East, Africa, South and Southeast Asia, the CIS, Europe, Latin America and Oceania. Certifications cover the EU (CE), Türkiye (UDEM), the Eurasian Economic Union (EAC) and China (CQC).

What payment and delivery terms do you accept?

Typically 30 % T/T deposit with the balance before shipment, or irrevocable L/C at sight for larger orders. EXW, FOB Shanghai, CIF and DAP terms are all available.

Do you provide installation and commissioning?

We provide installation guidance, commissioning checklists and remote support as standard, and can send engineers for on-site supervision and commissioning by arrangement.