
LiFePO4 Containerized BESS, 1MWh–6MWh / 1000kW (Liquid-Cooled, IP67)
- 1MWh / 5MWh / 6MWh
- Liquid Cooling
















No products match these filters. Try a wider capacity or ask us — most ratings can be built to order.
MARS containerised BESS combine LFP battery racks, battery management, power conversion (PCS), energy management (EMS), thermal management and fire suppression in 10 ft, 20 ft or 40 ft ISO containers, with a matching MV step-up transformer or prefabricated substation from our own factory. Systems from 500 kWh to 10 MWh serve peak shaving, solar and wind firming, frequency response, microgrids and back-up power.
Read how to specify a 1–5 MWh BESS or see a representative 2 MWh configuration.
kWh is energy — how much the container stores; kW is power — how fast it can charge or discharge. A 2 MWh / 1 MW system delivers 1 MW for two hours (0.5 C). Peak shaving and solar shifting usually need 2–4 hour systems; frequency response needs higher power and less energy.
Inverters are supplied with certification to IEEE 1547 / UL 1741 SA for the Americas, EN 50549 / VDE-AR-N 4110 for Europe and IEC 62477 / IEC 61000 generally. Tell us the network operator and we will match the required profile.
Yes — that is our advantage. The MV step-up transformer, ring main unit or containerised substation are built in the same factory and tested with the BESS as one system, with one point of responsibility.
Typically 10 years or a guaranteed cycle count on the battery system with a capacity-retention curve, and 5 years on the PCS. Extended warranties and performance guarantees can be quoted with a maintenance plan.