110–115 kV Three-Phase Oil-Immersed Power Transformer 20–50 MVA with OLTC
- 20 / 25 / 50 MVA
- 110 / 115 kV
- 11 / 23 kV
- 50 / 60 Hz
















No products match these filters. Try a wider capacity or ask us — most ratings can be built to order.
For primary substations, industrial plants and renewable-energy step-up, MARS manufactures oil-immersed power transformers from 3,150 kVA to 31,500 kVA at 35, 66 and 110 kV, with on-load or off-circuit tap changers, ONAN/ONAF cooling and two- or three-winding designs. Every unit is designed to IEC 60076 with the customer's impedance, vector group, tapping range and loss guarantees, and is available for witnessed FAT including temperature-rise and impulse tests.
Our FAT checklist explains the tests to witness; see a representative 66/11 kV grid configuration.
Standard values follow IEC 60076-5 (for example 7–8 % at 10 MVA, 10–12 % at 31.5 MVA), but impedance is set with the buyer against fault level and voltage drop; higher or lower values are available within design limits.
Yes — 66/11/11 kV and similar three-winding units for dual-busbar distribution, and 110/35/10 kV units for regional substations, with independent tapping on the HV winding.
Design review documents, outline and foundation drawings, nameplate, routine test reports for every unit, type-test reports, oil analysis, painting and packing specifications, and installation and maintenance manuals.
Typically 60–90 days for power transformers after drawing approval, depending on rating, tap changer and accessory lead times. Distribution transformers ship in 25–45 days.